Is there a way to run a scheduled backup manually?
#1
I know I can click the "Backup" button or use the Actions --> Backup menu item to start a backup, but this always starts a specific type of backup (Full, Incremental, etc.).  I want to run a  scheduled backup on demand. This way, whatever backup is next based on the schedule will run. Is there a way to do this?

Thanks,
Rich
Reply
#2
At the moment that option does not exist.  You need to know what's next in the schedule and use the MANUAL imaging feature of the task.
Reply
#3
(Today, 05:15 AM)Froggie Wrote: At the moment that option does not exist.  You need to know what's next in the schedule and use the MANUAL imaging feature of the task.

Thanks for confirming. Maybe I should add this to the feature request thread.

Rich
Reply
#4
@Froggie is correct, this option does not currently exist. This seems problematic: if there are multiple schedules configured within the scheduling settings, which one should be executed when running the schedule manually?