Pardon me for losing track of things in this long thread but I think the issue isn't remaking tasks that no longer work but the fact when the backup fails because of the geometry change there may be no notification that any number of backups have failed if the backup runs unattended. A way to allow backups to continue if there are structure changes without user intervention is to create a new Full instead of the incremental or differential which will take into consideration the structure and permit subsequent incremental and differentials to run. Hope I understood this correctly.
Scheduled Manual FULL Image after Disk Geometry Change
|
« Next Oldest | Next Newest »
|
Users browsing this thread: Epictetus, n8chavez, 2 Guest(s)