Hi first time poster, I hope everyone is well.
I have been using/evaluating your software for a few months after veeam let me down when i needed it the most, All has been going well on the backup side of things (luckily I've not needed to restore as yet), I had the software setup to do I full backup on a Sunday With 1 full backup image retention, and incremental Monday through Saturday in order to stop the incremental getting out of hand, on both my laptop and gaming PC.
I updated to V6.0.2 last night before bed and when i woke this morning I noticed the backup did not take place, it was telling me my network drive was unavailable (at least I believe that was what it stated, the red text was quite small on my laptop and I was still waking up lol).
The drive was indeed fully accessible and as I was pushed for time and the laptop is running okay I figured I would just delete the task and set it back up quickly before leaving.
It now says that the free version only supports one schedule when trying to set up the incremental after setting up the full, Is this as intended? My other PC running 5.9.4 has no such limitation, As I couldn't see it in the changelog, and the main page for HBS only has improved by the scheduling section. I thought i'd drop by and ask.
Thanks for your time.
I have been using/evaluating your software for a few months after veeam let me down when i needed it the most, All has been going well on the backup side of things (luckily I've not needed to restore as yet), I had the software setup to do I full backup on a Sunday With 1 full backup image retention, and incremental Monday through Saturday in order to stop the incremental getting out of hand, on both my laptop and gaming PC.
I updated to V6.0.2 last night before bed and when i woke this morning I noticed the backup did not take place, it was telling me my network drive was unavailable (at least I believe that was what it stated, the red text was quite small on my laptop and I was still waking up lol).
The drive was indeed fully accessible and as I was pushed for time and the laptop is running okay I figured I would just delete the task and set it back up quickly before leaving.
It now says that the free version only supports one schedule when trying to set up the incremental after setting up the full, Is this as intended? My other PC running 5.9.4 has no such limitation, As I couldn't see it in the changelog, and the main page for HBS only has improved by the scheduling section. I thought i'd drop by and ask.
Thanks for your time.